Image courtesy of Gehry Partners
Guggenheim
Abu Dhabi
Architectural & Institutional Leadership
Solomon R. Guggenheim Foundation | 2009–2014
Architecture: Frank Gehry / Gehry Partners
Guggenheim Abu Dhabi was conceived as an entirely new cultural institution on an unprecedented scale. A new building, a new collection, new curatorial narratives, and a new museum organization were being developed simultaneously. In a region with a rich artistic and cultural history but few precedents for an art museum of this international scope, the ambition extended beyond establishing a museum. It was an opportunity to reconsider the history of modern and contemporary art through a transnational perspective, placing the Middle East in conversation with the world.
Frank Gehry's extraordinary architecture was taking shape alongside the institution it would eventually house. Monumental cones, expansive galleries, and unfamiliar spatial possibilities invited new ways of imagining, commissioning, and experiencing art. But the relationship was reciprocal: the emerging artistic vision and the realities of museum life would also need to inform the developing architecture.
Cara directed the architectural development of Guggenheim Abu Dhabi on behalf of the Solomon R. Guggenheim Foundation from 2009 to 2014. Drawing on nine years at Gehry Partners, including her work on the Art Gallery of Ontario, she brought an intimate understanding of Gehry's creative process to an undertaking in which almost everything was being invented at once. Working across architectural, curatorial, institutional, and governmental disciplines, her responsibilities extended well beyond the building to the ambitious work of bringing a new museum into existence.
ARCHITECTURAL DEVELOPMENT
From Frank Lloyd Wright’s museum in New York to Frank Gehry’s Guggenheim Bilbao, architecture has played a defining role in the Guggenheim’s identity. Abu Dhabi presented an opportunity to continue that tradition while responding to a new cultural context and the requirements of an emerging international institution. The project’s ambition presented challenges that extended well beyond conventional museum planning.
Cara directed the Guggenheim’s architectural engagement throughout successive design phases, from Schematic Design through Construction Documentation. She worked with institutional leadership, curators, conservators, registrars, exhibition specialists, facilities professionals, and other museum departments to develop informed architectural direction grounded in their collective expertise.
Before major design reviews and workshops with Gehry Partners, Cara convened the relevant Guggenheim specialists to examine drawings, understand architectural proposals, evaluate operational implications, and establish institutional priorities.
These sessions were as much about investigation as consultation. Questions about how museum professionals performed their work frequently revealed that established procedures had evolved in response to the limitations of existing facilities. Practices developed around the Guggenheim New York’s curved walls, sloping floors, constrained art circulation, and geographically dispersed operations were not necessarily the practices that should guide a new museum.
The opportunity was to distinguish institutional standards from inherited compromises—and to use that understanding to inform the architecture.
Cara reviewed all architectural drawing packages from schematic design through construction documents, coordinated institutional responses, and represented the Guggenheim in demanding design meetings with Gehry Partners and Abu Dhabi stakeholders. Her responsibility was to exercise architectural judgment supported by the institution’s expertise, identifying priorities and advancing solutions that respected both the museum’s long-term responsibilities and the ambitions of its design.
The need for gallery doors, for example, became a significant point of discussion. Monumental openings were central to the intended architectural experience, but the museum also needed security, environmental control, and the flexibility to isolate galleries during exhibition installation and changeovers. Resolving the issue required an understanding of both architectural intention and institutional necessity.
The challenge throughout was not to choose between architecture and museum operations, but to develop a building in which each could support the other.
DESIGNING FOR ART
The Guggenheim has a history of bringing art and architecture together in ways that challenge convention. At Abu Dhabi, the building’s vast spaces and ambitious artistic program offered remarkable possibilities—but also demanded rigorous attention to the practical and ethical responsibilities of an art museum.
Cara led and coordinated the development of the museum’s art-installation strategy, a foundational component of the broader Project Implementation Plan. Long before the building’s anticipated completion, the Guggenheim needed to establish how artworks would safely enter, move through, and be installed within the architecture. The strategy connected the building-delivery schedule with the museum’s operational preparations, informing construction sequencing, building systems, contractual milestones, staffing requirements, and readiness for opening.
Working with curators, conservators, registrars, exhibition specialists, and facilities professionals, Cara developed an integrated approach that accounted for the specialized requirements of art installation.
A museum building cannot simply be declared complete and immediately filled with artwork. Its environmental conditions must be demonstrated to be stable, its safety and security systems operational, and its galleries prepared to accommodate works whose conservation and handling requirements may be extraordinarily demanding.
The installation itself requires careful sequencing. Curators need to evaluate works in relationship to one another; conservators and registrars must supervise their handling; specialized equipment and trained personnel must be available; and construction activities must be separated from vulnerable artworks.
At Guggenheim Abu Dhabi, the architectural scale and complexity amplified these considerations. The resulting strategy informed not only the museum’s eventual installation process, but architectural and construction requirements years before the building would be occupied.
It exemplified a fundamental aspect of Cara’s work: understanding what an institution needs to accomplish and translating that knowledge into decisions that shape its architecture.
COLLECTION STRATEGY & MONUMENTAL COMMISSIONS
The development of Guggenheim Abu Dhabi’s collection was inseparable from the architecture being designed to house it.
Working closely with Guggenheim curatorial leadership, Cara contributed architectural and strategic expertise to frameworks connecting collection development, acquisitions, artwork placement, and the design of the museum’s exhibition environments. Curatorial authorship and decisions remained with the museum’s curatorial leadership; Cara’s role was to help translate artistic and curatorial ambitions into the spatial, technical, operational, and planning conditions required to realize them.
The program of monumental, site-specific commissions was among the project’s most consequential undertakings. Artists would be invited to conceive works for architectural environments that had not yet been constructed. The spaces included monumental galleries and cones with unusual proportions and, in some cases, challenging environmental conditions.
Drawing on the Guggenheim’s institutional experience—including the installation of Richard Serra’s monumental sculptures at Guggenheim Bilbao—Cara led the development of a comprehensive strategy for bringing the commissions from artistic concept through fabrication, transportation, and eventual installation.
The work required an understanding of the artists’ creative processes alongside the technical, financial, contractual, and operational realities of realizing works at this scale.
Guided by institutional leadership, Cara developed a framework connecting successive stages of artistic development with the responsibilities of curators, conservators, registrars, fabricators, technical specialists, architectural teams, and the future museum.
By establishing sequences, dependencies, responsibilities, and decision points, the strategy provided a practical means of advancing highly ambitious artistic ideas while preserving the flexibility necessary for creative exploration.
DEVELOPING THE INSTITUTION
While the architecture advanced, the Guggenheim and its partners in Abu Dhabi were simultaneously establishing the collections, programs, operating procedures, staffing, and organizational structures of an entirely new cultural institution.
These activities were profoundly interconnected.
The challenge was further complicated by the division of responsibility in Abu Dhabi between the entities overseeing building delivery and those responsible for the museum’s collections and operations.
Cara’s responsibilities crossed those boundaries. Her knowledge of the building, combined with her relationships across the Guggenheim’s departments, positioned her to understand how decisions in one area would affect work elsewhere.
Working alongside her Abu Dhabi counterpart and collaboratively with all department heads, Cara co-led the development of the institution-wide Project Implementation Plan.
The undertaking required an extensive examination of the work necessary to establish the museum, from developing its collection and preparing exhibitions to recruiting and training personnel, establishing operational procedures, and preparing the building to receive art.
Cara and her partner developed much of the plan’s methodology through an iterative process of departmental workshops, strategic analysis, scheduling, and organizational planning.
The work required more than identifying tasks and assigning deadlines. It involved understanding the relationships among activities, anticipating dependencies, defining responsibilities across different organizations, and establishing a coherent path toward implementation.
Communication was central to the process.
Different museum disciplines understood their responsibilities through different professional frameworks. Cara adapted the presentation of information to the people using it, translating complex schedules and dependencies into diagrams, narratives, and planning tools that supported meaningful participation and informed decision-making.
The resulting methodology connected the parallel work of architectural development, collections, commissions, exhibitions, education, staffing, art installation, and operations within a coordinated institutional framework. The art-installation strategy served as a cornerstone of this work, connecting the building-delivery schedule with the operational sequence required to prepare the museum for art and opening.
The plan made visible the relationships and responsibilities underlying the institution’s ambitions—and provided a means of organizing the work required to realize them.
ARCHITECTURE & INSTITUTIONAL INTELLIGENCE
Guggenheim Abu Dhabi expanded the scale at which Cara explored the relationships among art, architecture, and human experience. From monumental spaces and physical models to the intricate systems required to establish a museum, the work demanded both creative imagination and a rigorous understanding of how ideas become reality.
That experience continues to inform her approach to cultural architecture: creating the conditions in which artistic ambition, institutional purpose, and the experience of place can reinforce and enrich one another.
PROJECT CREDITS
Project: Guggenheim Abu Dhabi
Location: Saadiyat Island, Abu Dhabi, United Arab Emirates
Institution: Solomon R. Guggenheim Foundation
Architectural Design: Frank Gehry / Gehry Partners
Cara’s Experience: Solomon R. Guggenheim Foundation, 2009–2014
Positions: Architecture Manager; Senior Manager, Architecture and Commissions; Senior Manager, Architecture, Commissions & Project Planning; Director of Architectural Projects
Developed in collaboration with Guggenheim leadership and museum professionals in New York and Bilbao, Gehry Partners, and cultural and building-development teams in Abu Dhabi.
Collection-development materials, acquisitions, commissions, and internal institutional documentation remain confidential.
RELATED THINKING
Designing for Transformation
On recalibrating the canon—and embedding that shift in the systems behind the galleries.